C / CONSTRUCTION
THE LOWEST COMBINATION PRINCIPLE WHICH ALLOWS YOU TO CONSTRUCT A FARE OVER AN INTERMEDIATE TICKETED POINT IN THE ROUTING WITHOUT BREAKING AT THIS POINT. THE CONSTRUCTED FARE RESULTING FROM THIS TECHNIQUE IS CONSIDERED A “DIRECT ROUTE FARE” AND MUST BE SHOWN ON THE TICKET.
TO CONSTRUCT A FARE FOR AN INTERMEDIATE TICKETED POINT.
YOU MAY USE ONLY ONE INTERMEDIATE TICKETED POINT AS A CONSTRUCTION POINT.
USE OF TWO OR MORE TICKETED POINTS IS NOT ALLOWED.
CAN NOT BE USED TO CONSTRUCT ORIGIN TO DESTINATION FARE.
SHOWN ON THE TICKET AS 'C/'.
C/ CONSTRUCTION – USE FOR
THE 'C/" CONSTRUCTION METHOD IS APPLIED PRIMARILY TO ESTABLISH MISSING FARES FOR USE IN VARIOUS CHECKS, SUCH AS:--
HIP CHECK (HIP)
BACKHAUL CHECK (BHC)
CIRCLE TRIP MINIMUM CHECK (CTM)
DIRECTIONAL MINIMUM CHECK (DMC)
ROUND THE WORLD MINIMUM CHECK (RWM)
COUNTRY OF PAYMENT CHECK (COP)
RETURN SUBJOURNEY CHECK (RSC)
USING 'C/' FOR HIP
THE FARE SHALL BE CALCULATED OVER AN INTERMEDIATE TICKETED POINT IN THE DIRECTION OF THE THROUGH FARE BEING CHECKED.
FARE CONSTRUCTION POINT CHOSEN MUST BE A TICKETED POINT IN THE COMPONENT SHOWN BETWEEN THE TWO POINTS.