KEY ISSUES
Civil Engineering Services:
Compliance with a multitude of legal requirements, directives, rules and instructions that hampers the effective delivery of services
Retaining and appointment of skilled and experienced technical personnel
Occupation of land which requires bulk infrastructure which is not consistent with water and sewer services master plans
Ageing infrastructure
Future augmentation of bulk water resources
Future cost for the development of a new cell at the Highlands Landfill
Electrical Engineering Services:
Compliance with safety and legal requirements.
Available bulk supply Capacity from Eskom at Yzerfontein and Darling
Impact of Eskom loadshedding on infrastructure and increase in theft of conductors
Malmesbury South-West: Electricity supply capacity shortage for new developments and unauthorized informal housing units
Increased unauthorized informal housing units in existing areas. Escalation of dangerous illegal connections
Escalation of vandalism and theft
Retaining and appointment of skilled and experienced technical personnel and inadequate personnel numbers affecting quality of service delivery and revenue protection
Maintenance of and expanding of streetlights networks in the Eskom areas of supply
Obsolete, aged and overloaded electrical infrastructure
MAJOR BACKLOGS
Wards 1 and 2
KORINGBERG
Sewerage
Sewer reticulation network poorly developed and must be extended.
Waste Water Treatment Works is overloaded and must be upgraded
Storm water
No formal piped storm water drainage system.
There are many unlined channels which causes erosion and maintenance problems
Water
Poorly developed network, small diameter pipes, low pressure and flow condition and open ring mains.
Sections of the water reticulation network are obsolete and must be upgraded.
Secondary chlorination at reservoirs must be implemented.
Streets
Backlog resealing program coupled with deterioration of road infrastructure.
Many roads are not constructed with kerbstone and formal sidewalks
Electricity
Eskom area of supply.
Street lighting inadequate
MOORREESBURG
Sewerage
Illegal discharge of storm water in the sewer collection system results in overloading an failure during storm events.
Localised frequent blockages in the sewer collection system.
Storm water
Maintenance of the No-Go River.
Regular blockages and flooding in Rosenhof.
Upgrading of systems in the vicinity of Royal Street and Rosenhof
Water
Obsolete infrastructure, pipe breakages, leaking valves and leaking hydrants.
Poorly developed network, shortage in shut-off valves.
Secondary Chlorination at reservoirs must be implemented.
Streets and traffic
Numerous problems are encountered with safe access to the N7 from both entrances to town, particularly the southern entrance. During winter months problems with bad vision is experience due to fog.
Backlog of street resealing program, deterioration of road infrastructure
Electricity
Old and Obsolete mini-substations and oil filled switchgear.
Wards 3 and 12
RIEBEEK WEST / RIEBEEK KASTEEL
Sewerage
Illegal discharge of storm water in the sewer collection system results in overloading an failure during storm events.
Sewer reticulation network poorly developed in Riebeek West and must be extended.
Storm water
Poorly developed infrastructure, regular flooding in the surroundings of Dennehof Street and Riebeek Kasteel East.
Water
Poorly developed network, small diameter pipes, low pressure, flow condition and open ring mains.
Sections of the water reticulation networks is obsolete and must be upgraded.
Secondary Chlorination reservoirs must be implemented.
Poor condition of Ongegund reservoir and pump station must be upgraded.
Streets
Backlog in resealing program with accompanied by deterioration of road infrastructure.
Many roads are not constructed with kerbstone and formal sidewalks
Electricity
PPC town’s network capacity for development limited.
Street lighting is inadequate.
Eskom Area of supply
Wards 4 and 7
CHATSWORTH AND RIVERLANDS
Sewerage
Sewerage systems must be extended.
Waste Water Treatment Works must be upgraded.
Storm water
Formal system is limited to housing projects and 5th Avenue Chatsworth.
Regular flooding of residences and erven.
Upgrading of storm water infrastructure in Chatsworth
Water
Secondary Chlorination at reservoirs must be implemented.
Bulk supply system cannot supply in the demand during peak months.
Water supply is under pressure due to illegal connections and wastage of water.
Streets
Gravel roads needs to be upgraded.
Construction of a bus route in Chatsworth
Electricity
Eskom area of supply.
Street lighting inadequate
KALBASKRAAL AND ABBOTSDALE
Sewerage
Sewerage system in Kalbaskraal is limited and should be expanded.
Storm water
No formal storm water drainage system, excluding low cost housing extensions
Water
Reservoir capacity must be increased for new developments.
Bulk supply system cannot supply in the demand during peak months.
Secondary Chlorination at reservoirs.
Streets
Gravel roads needs to be upgraded
Electricity
Eskom area of supply.
Street lighting inadequate
Wards 5 and 6
DARLING
Sewerage
Regular blockages in Darling North.
Waste water treatment works is at capacity and must be upgraded to supply future demand
Water borne sewerage system must be extended to the industrial area.
Storm water
Poorly developed system in Darling, upgraded of open channels along streets.
Many areas have no formal piped systems.
Many channels are unlined causing erosion and maintenance problems
Water
Poorly developed network, small diameter pipes, low pressure and flow conditions and open ring mains.
Sections of the water reticulation network are obsolete and must be upgraded.
Reservoir capacity must be increased for further developments.
Water supply to the industrial area must be increased to supply future demand.
Streets
Backlog resealing program coupled with deterioration of road infrastructure.
Curbs and formal sidewalks lack in many streets.
Electricity
Replacement of obsolete substations and networks
Upgrading of supply capacity subject to Eskom network expansion
YZERFONTEIN
Sewerage
Yzerfontein has no formal waste water treatment works as well as no water borne sewer system.
Storm water
Poorly developed system in the area of Carter Street, Buitekant Street, 6th Avenue and Felicia Crescent.
Water
Secondary chlorination at reservoir must be implemented.
Streets
Backlog resealing program coupled with deterioration of road infrastructure.
Electricity
Supply capacity inadequate for major developments
Upgrading of supply capacity subject to Eskom network expansion
Wards 8, 9, 10 and 11
MALMESBURY
Sewerage
Illegal discharge of storm water in the sewer collection system results in overloading an failure during storm events.
Localised frequent blockages in the sewer collection system.
Obsolete infrastructure causing regular blockages
Upgrading of distribution network is needed
Upgrading of main connectors in Voortrekker Street from swimming pool to Bokomo Road to accommodate future demand.
Storm water
Maintenance of Ilinge Lethu and Wesbank storm water system
Channel under Voortrekker Street from the Post Office to Bokomo Road
Retention structure in river north of the swimming pool
Maintenance of Diep-and Platteklip rivers.
Water
Portions of the water network are outdated and needs to be upgraded
Reservoir capacity should be increased for future development
Secondary chlorination should be implemented at reservoirs
Streets
Backlog of resealing program, deterioration of road infrastructure
Upgrading of Bokomo / Voortrekker Road intersection
Upgrading of Piketberg / Voortrekker Road intersection
Electricity
Replacement of obsolete substations and networks.
No supply capacity available for any developments west of the N7 not yet implemented. New 132/11kV substation and 132kV transmission line to be committed to allow services approval of further developments west of the N7.