2255 St Claude Ave
District: Faubourg Marigny - Full Control
Owner: Linda R Ebeling
Rating: Non-Contributing
Applicant: Lre Management Attn: Dara Glikmann
Description: Retention of demolition of Non-Contributing rated rear accessory structure over 1,000 SF to grade without a Certificate of Appropriateness.
HDLC Guidelines:
Section 12, Pages 23-24 – Guidelines for New Construction, Additions and Demolition
Retention Items & Recommendations:
Demolition to grade without a CofA: Approval with a minimal fine
Fine Range: $1,000 to $10,000
Staff Recommendations:
Sanborn map research indicates the original rear accessory was likely constructed between 1908 and 1937, toward the end of the period of significance for the local historic district. It also appears that the original wood-framed building may have been replaced or modified with a new iron structure including an expansion of its footprint to the rear sometime between 1937 and 1951. Based on this, HDLC considers the rear accessory to be a Non-Contributing rated structure. However, it is over 1,000 SF so the Commission must approve its demolition in advance. The applicant has noted the accessory building was substantially damaged during hurricane Ida (Aug/Sept 2021) and had begun to partially collapse and posed a safety issue. The applicant proceeded to demolish the accessory structure to grade without notifying HDLC and without applying for a demolition permit or Certificate of Appropriateness. The applicant is now requesting retention approval for this unpermitted work. The applicant should have contacted HDLC Staff about the deteriorated conditions so an inspection could have been completed and an application for the work should have been submitted prior to the full demolition. However, based on the age of the accessory, its Non-Contributing rating, and because it does not appear to have contributed architecturally or aesthetically to the surrounding historic district, Staff recommends approval of the retention request and recommends a minimal fine be levied for the unpermitted demolition. Because this demolition work was completed before August 1, 2022 it is subject to the previous fine schedule.
Case History:
10/16/2022: Application for retention of demolition to grade submitted.
09/28/2022: Application submitted for roof replacement at existing Contributing rated one-story commercial building fronting St. Claude Avenue. Staff noted that the rear accessory appeared to be partially collapsing around February 2022 and was subsequently fully demolished to grade without approval.
Previous Condition - 2009
Current Condition - 2022
Pictometry - January 2019
Pictometry - January 2022
Context Photos:
Confirmation of Date of Demolition - Submitted by Applicant:
Demolition Completed by March 25, 2022
Confirmation of Area of Structure:
Rationale for Demolition - Submitted by Applicant:
Site Photos - Submitted by Applicant:
Sanborn Maps:
1908
1937
1951
Overhead View - 2021
Street View:
HDLC Guidelines:
12: 23-24 – Guidelines for New Construction, Additions and Demolition