At this point in the design process, it is important to have your process and results evaluated by outside experts and stakeholders in the project. Were the results obtained and your analysis unbiased?
Yes, we obtained the results of our project from unbiased stakeholders.
Element J – Concepts and Objectives
Documentation of External Evaluation (Score 5/5)
Documentation of project evaluation by multiple, demonstrably qualified stakeholders and field experts is presented and is synthesized in a consistently specific, detailed, and thorough way.
Documentation is sufficient in two or more categories to yield meaningful analysis of that evaluation data; the synthesis of evaluations consistently addresses evaluators’ specific questions, concerns, and opinions related to design requirements.
Name
Title
Feedback
Collin McCawley
CAD Expert
"Well thought out, Good Cad Design, Through Testing Consideration"
John Singler
Biological Expert
Signed off on and thought the project was pretty good
Notebook References
Mecca