When it came to translate our idea into a physical form it took ardeuos work. First we needed to utilized our final concept variance and apply the adequate measurements to build a working scaled prototype that simulates the thermal conditions of a real house.
When it came to the development of our prototype to a physical form we were required to learn and apply a great variety of skills ranging from basic carpentry, to plumbery, to welding and pipe fitting. In combination of our effort, the correct use of our skills and the ideal selection of our materials we were able to finalize the building portion of our project.
After finalizing the excabation of the hole and the creation of the scaled building it came time for the total assembly of the project. Which required us to primarily connect the undeground piping with the piping within the room so we can close the system and allow for the recirculation to occur. This process would allow us to move on to the next stage of our project, that being the testing and data analysis portion.