Newark and Sherwood Core Strategy 2019
The application site forms the southern part of housing allocation NAP2C for 3,200 dwellings in the Newark and Sherwood Amended Core Strategy March 2019. The extent of housing allocation NAP2C can be seen opposite at visual 11.
Policy NAP2C ‘Land Around Fernwood’ sets out detailed requirements for the allocation which have been taken into consideration as part of the development of the outline planning application alongside the layout for Phase 1 of Fernwood South. In developing the layout for Phase 1 consideration has also been to policies contained in the Newark and Sherwood District Council’s Allocations and Development Management DPD 2013 and the Fernwood Neighbourhood Plan 2017.
Visual 9: Housing Allocation NAP2C Plan (Figure 7) from Newark and Sherwood Core Strategy 2019
The specific requirements of policy NAP2C are:-
“The area, as shown on the Proposals Map, is identified as a strategic site for housing (in the region of 3,200 dwellings); employment development (15 hectares) including provision of a high quality, landscaped B1 Business Park for individual regional and national HQ and high tech businesses; a local centre, comprising retail, service, employment and community uses; and associated green, transport and other infrastructure. The distribution of proposed uses is indicatively illustrated on Figure 7 – Land around Fernwood.
Development will be subject to the following requirements:
A Housing
Development to be undertaken in phases to be accompanied by appropriate provision of infrastructure and facilities, and in accordance with the highway improvements, which will be influenced by the detailed Transport Assessment for the site;
Seeking to achieve average density levels of 30 – 50 dwellings per hectare, with higher levels in areas of greatest accessibility in and adjacent to the local centre;
Affordable housing will be provided in line with Core Policy 1
B Employment
4. Development will take place to the south of the existing B1 permission as shown on Figure 7 – Land around Fernwood and Employment (Business) uses will be preferred including the development of an element of the site for a high quality, landscaped B1 Business Park for individual regional and national HQ and high tech businesses; however non B use employment opportunities to be considered where they comply with Core Policy 6 and the other policies of the development plan and do not end forming the majority of uses on the employment allocation.
C Local Centre
5. Provision of the new local centre, including provision of a new primary school and facilities for 3GPs (if required on site), as shown on figure 7 – Land around Fernwood shall be constructed as an integral part of residential development to ensure the creation of sustainable neighbourhoods at the earliest opportunity;
D General
6. Submission as part of planning applications by the developers of comprehensive development details, explanation and assessments, including:
i. Masterplan for the whole site to facilitate a comprehensive scheme, its integration with existing developments to the north and its relationship with surrounding countryside;
ii. Transport Assessment;
iii. Environmental Impact Assessment;
iv. Green Infrastructure Framework to illustrate how the development will maximise opportunities to enhance the environment;
v. Retail Impact Assessment, to consider the implications of the local centres 0n existing retail provision in Newark;
vi. Flood Risk Assessment;
7. Provision of transportation measures which:
i. Maximise opportunities for sustainable travel and increasing non car use;
ii. Achieve sustainable access to local facilities;
iii. Minimise the impact of the development on the existing transport network;
These will include:
iv. High quality passenger transport links to Newark and Balderton town centre;
v. Safe, convenient pedestrian and cycle routes within and adjoining the development;
8. Provision of Green Infrastructure in accordance with an agreed Green Infrastructure Framework in line with Spatial Policy 8, including:
i. Landscaping and structural planting throughout the development;
ii. Buffer zones to the A1, the East Coast Mainline and site boundaries with the surrounding countryside;
iii. Safeguarding and enhancing of the protected habitat of Shire Dyke which is designated as a LWS;
iv. Creation of quality open spaces, sports and playing fields;
v. Improvements to existing spaces;
vi. Links to the countryside beyond the site
9. Consideration of the provision of on-site renewable energy schemes to help meet the energy requirements of the development;
vii. Enhancement to existing habitats and the local landscape;
viii. Measures to mitigate any detrimental impact on environmental and built heritage features on and adjacent to the site in line with Core Policy 12.
10. Safeguarding of the lines of the oil and gas pipelines and electricity pylons, and of the Hazardous Installations Protection Zone around Balderfield Depot, whilst current operations remain.
11. Provision of flood mitigation:
i. Residential development will not normally be permitted within the Environment Agency’s Flood Zone 3.
ii. Development in Flood Zone 2 may be accepted where it incorporates appropriate flood mitigation measures in accordance with national guidance, including re-profiling land;
iii. Where appropriate incorporation of Sustainable Drainage Systems (SuDS);
Investigation and mitigation by the developer by any contamination within the site through agreed remediation techniques;
12. Provision of new and improved highway infrastructure;
i. New and improved social infrastructure;
ii. New and improved utilities infrastructure in conjunction with the Statutory Utilities and their roles and responsibilities including BT Open Reach (and any successor organisation) in meeting their Fibre to the Premises commitment;
14. Provision of contributions for local infrastructure, including facilities and services that are essential for development to take place or which are needed to mitigate the impact of development at the site or neighbourhood level will be secured through Planning Obligations utilising the Developer Contributions and Planning Obligations SPD in line with Spatial Policy 6."