• If a complete set of Construction Documents exceeds approximately 350 sheets it is to be split into Volumes.

  • If Volume 1 or 2 exceeds 350 sheets, additional Volumes may be used with Architecture + Interior Design made to be Volume 2 and Fire Protection + Plumbing made to be Volume 3, and all others Volume 4