Post date: Nov 23, 2014 10:30:00 PM
I've managed to work on things along and along, but haven't managed to keep up with updates in the interim. So today you see a lot of the pieces dry-fitted together:
I'm definitely going to re-build the gearbox/crank generator. It's undersized. This time I'll build it as a box and not a solid chunk made up of layers.
The HGA is cut from a bottle of Target-brand acetaminophen. :)
The N-filter is cut from two PVC couplings (for 2-1/2 pipe, I think).