Naked Singularity
Latest combat 'bot, planning to compete at Dragon*Con 2012 Robot Battles:
- Beetleweight (3-pound) weight class
- Wedge
- Simple and sturdy:
- Most parts using standard part sizes to minimize fabrication needs, e.g., internal frame is made from 1"x0.25" 6061-Aluminum bar, which means I only have to cut the bar to length, not width.
- All critical dimensions are adjusted to multiples of 1/8" to make measurement easier and less error-prone.
- Held together with machine screws; holes tapped directly into the metal frame
- Wheels mostly protected from spinner weapons. Wheel guards have some flex, hopefully to absorb more energy without damaging the rest of the 'bot. The guards also sit approximately 1/2" away from the wheels to give a buffer zone -- it takes that much more energy for a spinner to actually hit the wheels.
- 4-wheel drive (separate motors for each wheel)
The guts:
- Gearmotors: Beetle B16's
- ESC: Scorpion XL
- Battery: 850 mAh 11.1-volt LiPo (Power Edge)
- Wheels: 1-3/4" Lite Flight wheels with Dave's Hubs
- Tx/Rx: my trusty Futaba 4YF 2.4 GHz Tx with R2004GF Rx
- Internal frame: 1" wide X 1/4" thick 6061-Al
- Top armor: 1/8" thick 6061-Al sheet
- Bottom armor & wedge: 1/8" UHMW polyethylene sheel (used on bottom to save weight)
- Wheel guards: 1-1/2" (ripped to 1-1/4") X 1/8" UHMW polyethylene bar
- 1/4" X 1/4" 6061-Al bar used as attachment brackets
- Fasteners: 6-32 machine screws, Torx drive
- 3/8", flat head (wedge attachment)
- 1/2", pan head (most frame and armor connections)
- 1/2", flat head (a few frame/armor connections where space is tight)
Specs, name, and materials are, of course, subject to change. :) With luck I'll do most of the work over Spring Break in a couple of weeks.
Robot Battles 46 Report — Jan 27, 2013 1:06:32 AM
Dragon*Con 2012 Robot Battles: Microbattles Report — Sep 2, 2012 10:01:06 PM
Added Some Bling — Apr 20, 2012 1:41:52 AM
Weigh-in — Mar 26, 2012 6:21:02 PM
Spring Break, Day 6: TURBO-CHARGED!!! — Mar 24, 2012 6:05:58 PM
Spring Break, Day 3 — Mar 21, 2012 7:32:27 PM
Spring Break, Day 2: A Rough Approximation of "Done" — Mar 20, 2012 9:44:34 PM
Spring Break, Day 1 — Mar 20, 2012 12:03:05 AM
Hard Top — Mar 11, 2012 10:56:18 PM
The Lovely Bones — Mar 11, 2012 1:32:07 AM
Beetle B16 / B62 Gearmotor Mounts — Mar 11, 2012 1:29:52 AM
All parts are in — Mar 8, 2012 2:05:03 AM
Name Change! (And some thoughts on the CAD process) — Mar 6, 2012 2:34:22 AM