Simonsbath Common leads into Simonsbath module through a cutting. Both modules are set in the Autumn and on the Common the Red Deer are beginning their rut whilst the local Scout group are beginning their training for the following years 10 Tors Challenge
The stream is the head water of one of the many that run into the River Barle, the embankment having been built over the actual spring itself.
The board is 1000mm x 210mm with a backscene that uses the common 250mm height above the single line track level. It is intended to fit on the left side of the Simonsbath module when viewed.