This section will guide you through the basics of the iBIM connectors.
With the iBIM connectors you and your project team shall achieve a significant reduction of e-mail, clash-meetings, client-contractor meetings and other meeting moments. The collaboration- and communication aspects shall all be covered through the iBIM connectors and stored directly in our online project management database in Relatics. This way the BIM modelers, project engineers, project managers, program managers, designers, (sub-)contractors and the client all work with the same information. The project is hereby working with a single source of truth (SSOT).
The iBIM connectors are developed to connect the Neanex environment to the BIM software. This way the information stored in the Neanex portal is always in sync with the information in the BIM model. With information in sync there is no chance of working with outdated- or wrong information. Failure costs shall be reduced significantly.
If you are interested in a demonstration about the basics- and functionalities of the iBIM connectors, don't hesitate to contact us.
Having problems understanding the basics? Check our troubleshooting and FAQ's for more information.