School Veterinarians - Second grade students take turns to help feed and care for the Science Lab pets: Einstein and Newton the tortoises, Brownie the guinea pig, and Milo the crested gecko.
Thanks to Dr. Marc Bordelon for presenting a lesson to our second grade students about veterinarians!