Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Final runs of initial testing phase
Once finished, will present results to sponsor and go through rigorous design review, thus will begin the redesign phase
Accomplishments from Previous Week
Stress
As seen in proof of concept, assembled form factor for rubber band testing (John)
Assembled rubber bands to best resemble nerves (John)
Split rubber band = severed
Stapled rubber band = sutured
Used calibration weights instead of graph to calibrate FSR (John and Ryan)
Curve fit data points (Ryan)
Tested ability to get values on rubber band (John)
Began search for smaller circuit components (bread board, LCD Screen, battery pack, microcontroller) (Ryan)
Strain
Successfully developed working MATLAB script and obtained displacement matrices (Archana and Tejas)
Used spherical markers on rubber band surface and stretched the bands to simulate deformation (Tejas)
Began search for different marker types (Archana)
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Stress (John and Ryan)
Create list of new components to order for next iteration
Create list of all design decisions for design review
Specific list of materials for new iteration → made of different materials for different functions
Strain (Archana and Tejas)
Start looking into adhesives and biocompatible methods to attach the markers to the tissue surface
One potential concept is a “barbed” marker with little claws to grip the outer surface of the nerve tissue
Look into the concept of using “sticky” surgical rulers along with injectable medical dye to measure the marker movement
Overall (All Members)
Design Review w/ Sameer
Looking to create a “final” iteration instead of more multiple prototypes
Looking to critique all aspects from testing phase, take into consideration for this last iteration
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Sponsor Meeting held on Tuesday, February 9 (over Zoom)
Pleased with current progress and where the group is in the grand scope of the project
Was nice to hear, team is looking to have a solid final design to cap off all progress made this quarter
During last phases of testing, wants us to document all design decisions regarding prototypes and anything else we might want to add or change
Will document and organize all decisions made, along with comments and recommendations for changes to integrate in next iteration
For stress: look into eventual biocompatible materials for clamps (not necessarily for manufacturing right now, but for future of device)
Will look into most biocompatible 3D materials we can use, will add list of biocompatible materials for design recommendations at the very least
For strain: look into bio compatible ruler for distance calibration for camera
Will look into obtaining such ruler
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Comments from Proof of Concept presentation
Make sure equations are written with equation editor, no use of regular, typed out format
Will make sure all equations are presented in a professional manner
Depending on stopping point of device development, be sure to add section in final report regarding recommendations for production
Team has already started noting ideas for future production, will add into recommendations section in final report
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
Comments from Proof of Concept Presentation Questions and Chat Messages
Received messages with recommendations of materials to help functionality of device, such as delrin and other low friction materials for better translational movement
Risks and Areas of Concern
Not active risks
Main area of concern/focus of team is to prepare next iteration to be as close we can get to what we want in a final design
Resources or Information Required but not Available
Resources/Info not available right now have plans for access down the line
Schedule
Thursday-Weekend:
Organize results from testing
Prepare lists of concerns, components to buy, and design decisions for design review
Begin preliminary design of next iteration
Monday-Wednesday:
Meet for design review amongst team and with sponsor
Begin changes to designs for next iteration
Budget (list amount spent and amount remaining)
Amount Spent: $157.66 (will change next week)
Amount Remaining: $2442.34
Progress on Report and Webpage
First rough draft of report added to website
Will be constantly update as team gets closer to final design
Webpage updated
Website interface update to fit theme, some details added, will be more filled out in coming weeks