Progress Report Week 9 Winter Quarter
Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Works great!
Prepping for final design review at Rady on March 14th.
Designing neck car for outside attachment rather than complicated inner looping
Moving possibly towards CNC-ing the mold
Accomplishments from Previous Week
Successfully completed the PDR
Completed Draft II
Noted high risk areas from current design + working towards improvements
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Feedback for other team’s report (all)
Neck collar fitting (Rahaf)
Get iron supplements for blood scent (Samantha)
Work toward final draft (all)
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments
N/A, they couldn’t meet (traveling to ECMO conference)
Meeting March 4th to discuss current prototype
Instructor Comments from Last Meeting and Actions Taken to Address these Comments
Slides need to situate the complex research that has been done to finalize material + component choices.
Need to show the analysis and testing and reasoning behind design decisions, as opposed to just stating the end results
Final presentation is not time limited so we won't have to keep the slides short like in the PDR
Overall, good job & fun demo.
Risks and Areas of Concern
Kinks within blood flow tubing
Could possibly be mitigated by positioning the neck collar slightly differently and adjusting the length of the tubing
Schedule
Gantt chart: