Concisely list and prioritize the project objectives and constraintsÂ
High Priority Objectives
Vasculature size and texture for jugular vein and corotid artery
Accurate representation of blood pressure
Second Priority Objectives
Improve efficiency of manufacturing skin/muscle
Other Constraints and Issues
Maintain accurate representation for different ages
Potentially create a model for veins/arteries in the leg
WOW Design Solution
A design that is relatively easy and inexpensive to manufacture
Accurately represents what it is like to perform ECMO on both children and adults
Provides accurate feedback when surgeons perform the simulation
Risk Reduction Strategy
List areas of risk and strategy that will be used to eliminate risk really in the design process.
Highest risk: vasculature that is accurate in dimensions, texture, and feedback when cutting.
For our risk reduction, several materials were purchased, tested and compared for the following categories:
Biomaterials
Bioengineered materials
Industrial off-the-shelf materials
Hollywood/special effects materials
3D printing
Previous medical solutions or simulations
Food industry
Intermediate Milestones
Identifying meaningful intermediate milestones is a critical for effective project management. Together with your sponsor identify such milestones, and specify specific performance requirements you aim to meet at each milestone.