Progress Report, Week 2, January 14 2020
Overview of the Status of Analysis, Design, Fabrication, Tests, etc.
Met with sponsor on Tuesday, January 14th to recap progress from last quarter
Simulation analysis conducted on waistband seal and O-ring buckling
Component options explored for making reinforcement O-rings
Installed weight display.
Accomplishments from Previous Week
Chamber buckling scale model and FEA analysis completed
Determined potential design solution(s) to chamber buckling: internal reinforcement rings and/or cables between rings
Completed FEA Analysis for pressure leakage and air flow through waistband
Researched fabrication methods for internal ring support (final design stainless steel tubing)
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Determine the component for prototyping and purchase items(Brian and Jackie)
Design attachment mechanism for reinforcement rings.(Jackie)
Research potential waistband materials (Jen)
Determine cost and lead time for bending stainless steel tubing into 24inch circles (Jen)
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Meeting with sponsor has not occurred(scheduled for 7:30am January 14th, 2020).
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Stainless steel tubing design for ring - preliminary fabrication research begun
https://www.bassettinc.com/tube-bending-and-fabricating.html
https://www.sharpeproducts.com/custom-pipe-and-tube-bending
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
N/A
Risks and Areas of Concern
Implementation of design decision into the current design prototype as risk reduction has mostly concluded.
The designed mass of the prototype may increase due to added structural components and additional display units.
Resources or Information Required but not Available
N/A
Schedule
Describe upcoming milestone: Obtain prototype materials for the chamber buckling problem and test
Obtain samples for potential waistband materials
Budget (list amount spent and amount remaining)
N/A
Progress on Report and Webpage
Beginning structure of final report for the upcoming week