Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Design and CAD for Ball Clamp is in progress
Tests to calibrate CNC machine has not begun
Hardware for CNC machine has been completed
Software for CNC machine has not begun
Gear Train System currently being converted to a friction drive system
Accomplishments from Previous Week
CNC machine hardware finished
CAD for Ball holder is near completion
Acquired lab space
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Complete Friction Drive design for gear system and begin construction (Jacen)
Set up software of the CNC machine (Marshall)
Finish CAD of ball holder and begin construction (Aaron)
Work with Ian Richardson to create an EDM process for the custom drill bits
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Meeting set up with sponsor for May 2nd
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Ian Richardson:
Silicon may be an option for an abrasive surface (in person 4/23/19)
Professor Ghazinejad
Look into EDM for the custom drill bits (in person 4/23/19)
Emailed Ian Richardson to discuss this topic
A non-polished surface from EDM may provide the abrasion necessary for the end bit
James Lynch
Research into polishing bits for jewelry (in person 4/23/19)
Research has been done into different type of abrasives used to polish jewelry
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
N/A
Risks and Areas of Concern
Will the EDM method be precise enough for the drill bits?
Will the bits spin at a low enough torque for a friction drive system to be operable?
Resources or Information Required but not Available
Need to talk to Ian Richardson about the EDM process.
Schedule
Milestone: Begin phycical construction of the system
Update Gantt chart.
Budget (list amount spent and amount remaining)
Spent: $286.43
Remaining: $9,713.57
Progress on Report and Webpage
Standards section has been completed