Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Design: We have finalized designing all components
Fabrication
Rectangular antenna range: We have primarily assembled the rectangular chamber.
Gantry system: We have fabricated all major components for the gantry system and assembled them together.
Cooling system: We have fabricated all major components of the cooling system.
Test:
Gantry system: We have tested the gantry system, and everything works pretty well
Cooling system: We have tested the cooling system, and everything works pretty well
Accomplishments from Previous Week
Han Cui: Manufactured sandwich panels for the anechoic chamber; Assembled the anechoic chamber
Yingqiao Jiang: Manufactured sandwich panels for the anechoic chamber; Assembled the anechoic chamber
Jiahao Fu: Manufactured sandwich panels for the anechoic chamber; Assembled the anechoic chamber
Yue Wen: Redesign the motor cover and set up the end stop.
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Everyone: Finish up the project (Report, Webpage, Poster, etc.)
Han Cui: Manufacture remaining components for the anechoic chamber; Assemble all components together
Yingqiao Jiang: Finish assembling and update the mount for cooler
Jiahao Fu: Finish assembling the anechoic chamber and gantry system.
Yue Wen: Assemble all components together and perform the final test.
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (5/31 in person)
Arrange the presentation to the sponsor to the Monday of Finals week.
Some special moving patterns of the gantry system are specified.
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
If we end up going over the budget, we need to let the professor know.
Discussed the mounting of the cooling system.
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
N/A
Risks and Areas of Concern
N/A
Resources or Information Required but not Available
N/A
Schedule
Budget (list amount spent and amount remaining)
Spent: $1966.82
Remaining: $33.18
Progress on Report and Webpage
Report: We have started improving the report based on the comments received from Team 8 for the final submission
Webpage: We have started working on the final webpage
Poster: We have finished the draft poster