Weekly Progress Reports
Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Risk reduction test completed Thursday the 14th at Fiesta Island
Preliminary analysis demonstrated that the water jet helped significantly
Cheek plates will be mounted to front tow shackle to deflect obstacles
Accomplishments from Previous Week
Completed prototype blade fabrication
Conducted test with new plow style blade and water jet
Got new/more test materials from sponsor
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Order material/start fabrication of actual sled (Zak)
Analyze data from test (Zak)
Order materials/start fabrication of steel blade (Joe)
Look into a stronger pump so that water jet can cut quicker (Joe)
Order materials/ start fabrication for reel to trough system (Paulina)
Call DeepSea Power and Light and get information/cost of battery cells (Paulina)
Order and get materials from the sponsor and start fabricating the cable reel (Hanh)
Integrate reel into test sled so cable laying can be a part of next test (Hanh and Paulina)
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments
New design of plow blade may be too thin to provide enough downward drag
Adding wider cutting teeth
Deep sea batteries do not hold charge
Going to replace internal battery packs
Using regular sea battery for risk reduction test
Polycarbonate prototype blade may have stress cracks near mounting locations
Adding inserts for bolts
Instructor Comments from Last Meeting and Actions Taken to Address these Comments
Use a rod with pivot point that is pulled to push brush into reel
Will work better than spring method and will not have as much play so that pressure from the brush is even
Risks and Areas of Concern
None
Resources or Information Required but not Available
Remind Professor T. to talk to Mark about how the donation to pay for project will work and what the timeline will look like for it
Schedule
Get materials for new sled and blade design
Begin manufacturing and assembly of new designs
Begin integration of reel onto test sled
Update Gantt chart.
Budget (list amount spent and amount remaining)
Spent $300
Remaining $3700
Progress on Report and Webpage
Report has been started
Title and Background have been added
Statement of Requirements, Deliverables, and Review of Existing Solutions are done
Impact on Society has been added
Webpage has been started.
Initial files and presentation uploaded
Cover page executive summary added