Water Street update

Post date: Jun 22, 2018 5:21:48 PM

from DOT engineer 6/22

I just received word that J.S.RAE has retired their old main line and is active on their new line down the center of the road. C&A Construction is now scheduled to come back on Tuesday the 26th. They will be working on the remaining drainage structures that need to be installed. Along with this work, Wagner Wood, will be on site as well removing the tree located at the Podmore residence and the Verizon building.