Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Operator - math complete, reworking of 2nd operator in progress
Math verified with Dr. Ghazi
Reworking has some work to do:
select spring to make halves move in unison
select spring to resist torsion
interface w/ Mini WW
material selection
Spring cam design nearly complete
Accomplishments from Previous Week
Initial fatigue analysis of the spring cam
Verified mathematical model with professor and sponsors
Professor: model seems sound
Sponsor: the math makes sense, the more precise model would be preferred but that is beyond our capabilities as undergraduates
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Complete report and webpage by June 5
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Sponsor meeting, 5/29
report work - see attached comments on Report 2
operator - continue to develop the operator design (doesn't need to be fully fleshed out, but it should be explored)
plan to reexamine operator over the weekend
will consider interface with the Mini WW
paper should primarily highlight the spring cam system
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Dr. Ghazi, Zoom, 5/28
the spring cam design should be reworked so that the fatigue factor of safety is higher than 1.5
plan to verify GDT with Rishabh
discovered issues with fatigue analysis on SolidWorks, plan on doing hand calculations
operator math is good, so long as we can verify that the solution is acceptable with SIO we're in good shape
discussed math with SIO - we have a bit of tweaking to do
plan to work more on operator
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
The Solar Turbines team also noticed issues with SolidWorks fatigue and really liked my seal background
Risks and Areas of Concern
Proper redesign of operator system
Resources or Information Required but not Available
Schedule
Final design review Thursday, June 4
Everything is due Friday, June
Budget (list amount spent and amount remaining)
Progress on Report and Webpage
We're about 90% complete on the report
Webpage - weekly update, improvements to front page and files