surveyor fix points - Phase 20
anchor plates - Phase 21
set-out points - Phase 22
If the measurement points have been moved in the model, we must give the surveyor his initial fixed points.
To check: compare center of gravity coordinates to measured points
from the list: LVSP - landmeter vaste punten (surveyor fix points)
In Tekla those points have triangle around them
Model: D50 | Dummy (not all capital letters) - in center of point 50mm (25mm up and down)
Change Name same as initial Point number
questions:
Size of mold plate? Same as size of base plate?
Orientation hole 1mm? No bolt?
Use component: typ ankermal
Explode
PL2 S235JR class-6
Set out points for anchors without mold plates
Model: BLOK10 | Dummy (not all capital letters) - in center of point 10mm (5mm up and down)
GA template: # boorplan
Drawings should have 3 lists:
»»» boormallen «««
»»» meetpunten landmeter «««
»»» uitzetpunten «««
Show only: Concrete and Measurement Points
Single part drawings - malplaat
NC - LASER-BRAND
DXF ( CS DSVT to DXF)
Rotate
Add axis and label
Add correct quantity
Lists
fix points surveyor
anchor plates surveyor
set-out points surveyor
dds platenlijst brand-laserwerk