Shelburne
Millbury
Millbury: The Rebuilt Lines would begin near Branch River at the Millbury Station in Millbury, run along Providence Street, cross the Blackstone River Bikeway intersecting the Providence and Worcester Railroad, and continue along South Main Street (intersecting Woodland Street, Sycamore Street, and Singletary Brook). The Rebuilt Lines would continue north through Elm Street, where they would intersect Worcester-Providence Turnpike (State Route 146) before passing through Elmwood Street, Shaw Schools Recreational Fields, and Witter Lane. From there, the Rebuilt Lines would pass Greenwood Street and intersect Dwinell Road before entering Auburn.
Auburn: The Rebuilt Lines would enter Auburn and cross Washington Street to connect with the Pondville Substation before proceeding west, where they would intersect Ramshorn Brook, the Penn Central Railroad/Norwich, and Worcester Railroad. The Rebuilt Lines would continue west, passing through Hillside Cemetery and intersecting Central Street and Saratoga Road before crossing Interstate 90. The Rebuilt Lines would then cross Interstate 290 and pass through Auburn Recreation Complex (also known as Oxford Street Recreation Area), which is adjacent to Bayman Street. From there, the Rebuilt Lines would intersect Oxford Street, continue past Bryn Mawr Avenue, cross Dark Brook and run west, intersecting Leicester Street, Chapin Brook, Rochdale Street, Penn Central Railroad, and Drake Court. The Rebuilt Lines would cross Chapin Brook and Leicester Street before entering Leicester.
Leicester: The Rebuilt Lines would enter Leicester, transect Stafford Street and Henshaw Street, cross Grindstone Brook and Bunker Hill Road, and continue to Peter Salem Road, connecting with the Leicester Substation. The Rebuilt Lines would continue west and then transect Peter Salem Road, Pleasant Street and Memorial Drive. The Rebuilt Lines would continue southwest and cross Town Meadow Brook and Burncoat Brook, continue west, and then cross Pine Street and Charles Street before continuing northwest to pass through Burncoat Brook again as they enter Spencer.
Spencer: The Rebuilt Lines would enter Spencer and continue northwest, crossing Greenville Street, R Jones Road, Spencer State Forest and Midstate Trail (an unpaved road). The Rebuilt Lines would continue northwest and intersect Ash Street, continue to Ashview Drive connecting to Maple Street, cross Charlton Road and continue past Pleasant View Road and Bixby Road Circle and continue northwest towards the intersection of West Main Street and Bixby Road. The Rebuilt Lines would cross the intersection of Olde Main Street and Meadow Road before connecting to the Meadow Street Substation. From there, they would continue west over the Seven Mile River, crossing Smithville Road before they enter East Brookfield.
East Brookfield: The Rebuilt Lines would enter East Brookfield, continue northwest to connect to the Harrington Switchyard, and then cross over Lake Lashway before entering North Brookfield.
North Brookfield: Crossing over Lake Lashway, the Rebuilt Lines would enter North Brookfield, cross Shore Road and the Five Mile River. From there, they would transect Old East Brookfield Road, continue through a wooded area and cross over the Penn Central Railroad before crossing Dunn Brook. The Rebuilt Lines would pass through the intersection of East Brookfield Road and Donovan Road, then over the Forget-Me-Not-Brook before connecting with the Lashaway Substation. From the substation, the Rebuilt Lines would continue northwest through the Donovan Road Conservation Area where they transect Fullman Road near Fullam 8 Hill Road Conservation Area, Brookfield Road, and West Brookfield Road.
The Rebuilt Lines would enter the North Brookfield Town Forest, intersecting McCarthy Road before crossing Coys Brook and continue northwest, crossing Old West Brookfield Road, Coys Brook, and Tucker Cross Road. The Rebuilt Lines then would cross Smith and Hanson Road before entering West Brookfield.
West Brookfield: The Rebuilt Lines would enter West Brookfield, cross Wigwam Road, New Braintree Road, and Birch Hill Road, enter the West Brookfield State Forest, cross Sucker Brook and Shea Road. The Rebuilt Lines would continue west and cross Madden Road, Mill Brook, Wickaboag Valley Road, Ragged Hill Road, John Gilbert Road, Lamberton Brook, Cedar Drive, and Peirce Road before passing through Rock House Reservation and Corydon W Kibbe Agricultural Preservation Restriction Area as they enter Ware.
Ware: The Rebuilt Lines would enter Ware and cross Gilbertville Road (Route 32) before connecting to the Ware Substation. From there, they would continue past the CSX Transportation Railroad, cross the Ware River, Church Street, Old Gilbertville Road, Sheehy Road, the Muddy Brook, Greenwich Road, Sorel Road, Osborne Road, and finally the Flat Brook. The Rebuilt Lines then would cross Old Poor Farm Road, King George Drive, Greenwich Plains Road, and Fisherdick Road, the Quabbin Reservoir Watershed, Beaver Brook, Peppers Mill Pond, Old-Ware Enfield Road, Belchertown Road, Webster Road, and Belchertown Road again.
The Rebuilt Lines would continue through the Quabbin Reservoir Watershed and cross the Swift River into Belchertown.
Belchertown: The Rebuilt Lines would enter Belchertown and continue through the Quabbin Watershed Reservoir, cross Winsor Dam Road, and then run between Blue Meadow Road and the Quabbin Reservoir, where they would connect to the Quabbin Switch Substation. The Rebuilt Lines would continue northwest, transect Cold Spring Road, then continue through the Quabbin Reservoir Watershed, crossing Warner Street, Earley Street, and Old Enfield Road before continuing north along the Quabbin Reservoir to enter Pelham.
Pelham: The Rebuilt Lines would enter Pelham and continue northwest into the Quabbin Reservoir Watershed to cross Packardville Road, Cadwell Creek, and the Daniel Shays Highway. The Rebuilt Lines would continue into the Cadwell Memorial Forest and cross Dunlop Brook and Amherst Road. They would continue northwest and cross over the Amethyst Brook and North Valley Road before continuing through the Buffam Brook Road Conservation Area and then crossing Buffam Road to enter Shutesbury.
Shutesbury: The Rebuilt Lines would enter Shutesbury, pass through the Amherst Watershed, and then cross Dean Brook, Sand Hill Road, Nurse Brook, and Pratt Corner Road before connecting to the Shutesbury Substation. The Rebuilt Lines are then proposed to cross over Nurse Brook again before entering Leverett.
Leverett: The Rebuilt Lines would enter Leverett and continue northwest, crossing Roaring Brook and Cushman Road. They would then cross Doolittle Brook in the Beaver Pond Conservation Area, Depot Road, Amherst Road, Long Plain Road, and the New England Central Railroad before entering Sunderland. Sunderland: The Rebuilt Lines would enter Sunderland through the Mount Toby State Forest and Mount Toby Wildlife Management Area before crossing Montague Road, Chard Pond, and 9 Falls Road. The Rebuilt Lines would then run along Gunn Brook and cross over the Connecticut River into Deerfield.
Deerfield: The Rebuilt Lines would enter Deerfield, cross River Road, and then continue to the west, crossing Clapp Brook, Steam Mill Road, the Boston and Maine Railroad, and Massachusetts Route 10. The Rebuilt Lines would then cross the Fuller Swamp Brook and Mill Village Road adjacent to farmland to continue through woods and farmland and ultimately cross Interstate 91. The Rebuilt Lines would then run parallel to Sand Gully Road, cross Stillwater Road, Hoosac Road, and the Deerfield River to enter Conway.
Conway: The Rebuilt Lines would enter Conway adjacent to the Deerfield River and Mohawk Trail, cross over the South River, Bardwells Ferry Road, and the Boston and Maine Railroad before entering Shelburne.
Shelburne: The Rebuilt Lines would enter Shelburne and cross the Deerfield River near Dragon Brook and Orchard Road. They would continue northwest before crossing Barnard Road. The Rebuilt Lines would then run parallel to the Deerfield River before connecting to the Deerfield #2 Substation. They would then run parallel to the Boston and Maine Railroad, cross over the Deerfield River again and then the Mohawk Trail. From there, the Rebuilt Lines would proceed north where a tap line connects to the Deerfield #3 Substation across the Deerfield River.
The remainder of the Rebuilt Lines would continue northwest before terminating at Deerfield #4 Station near Main Street. Descriptions of Tap Line Replacements Quabbin Switching Tap: The Project includesreplacing the two tap lines in Belchertown that would connect with the Rebuilt Lines at the Quabbin Switching Tap and Tower near Blue Meadow Road.
Quabbin Switching Tap extends approximately 0.1 miles to Quabbin Switching Tower in Belchertown. Deerfield #3 Taps: The Company also proposes replacing the two tap lines that would connect to the Rebuilt Lines at the Deerfield Generating Station north of the Deerfield River in Shelburne. The Deerfield #3 Taps extend approximately 0.5 miles to the Deerfield #3 Generating Station in Buckland. Shutesbury #704 Tap: The Company proposes replacing the two tap lines that would connect to the Rebuilt Lines at the Shutesbury #704 Substation near the Pratt Corner Road. The Shutesbury #704 Taps extend approximately 0.02 miles to the Shutesbury #704 Substation in Shutesbury.