This is the last and biggest mission in which as a global team you will build a Final Prototype for your main challenge.
Each Submission has the aim to guide you to the final deliverables of the SUGAR Project
Get ready for an amazing phase!
Aim
Develop a final prototype that solves the user needs
Deliverables
X finished parts of the product
Brochure and poster
Final presentation
Final Documentation
Aim
Get one (non-trivial) part of the design into its final form.
Deliverables
One finished part of your solution
SGM presentation
DL
25- 04 - 2023
Pick a part of your design that you are fairly settled on, get it out of the way so that you can check it off on your "to do" list. It is not something you buy. It is something you design and make or have made for you (it can include purchased elements, but not be something purchased as a whole). It is real. It is not the plans or an idea for something – it is the thing (CODE included). Real dimensions. Real materials. The idea is not to have a project plan in which "...everything comes together around mid-May and we assemble and debug it in time for June." Instead, we want to have at least part of the system done early enough to start undergoing some refinement. So get at least one piece of your design "nailed" early.
Aim
Get the 80% of your prototype in its final form.
Deliverables
80% of your solution finished
SGM presentation
DL
09- 05 - 2023
The 80% of your hunting plan must o be ready to use, test and look on this day. This is the time to make real the most of things that you design for your final solution.
Important to share drafts, advances and designs for your EXPE, show in the SGM the progress on: Booth, brochure, slides-presentation, video teaser and the material you think is necessary to explain and share the final solution.
**For EXPE Presentation the time is between 12-15 minutes.
**For Teaser Video time between 30-90 seconds.
-Missions content shared by LIU University-