Jan. 29: Started thinking of ideas for project, decided on CAD
Jan. 30: drew up sifter and magnet idea
Jan. 31: started prototyping with plastic box, nut, and bolt
Feb. 1: cleaned lab closet while waiting for Ethan to cut out slots on box, tested prototype, worked well but bend in plastic let bolts go through, decided to use rigid materials (if I were to make it in real life)
Feb. 4: started CAD of base
Feb. 5: Happy Lunar New Year!
Feb. 6: CAD got lost, restarted
Feb. 7: CADed base
Feb. 8: CAD workshop day
Feb. 12: started making/assembling CAM
Feb. 13: finished CAM
Feb. 14: CAD workshop day
Feb. 25: edited slot on base to fit CAM on perfectly
Feb. 26: added connector for CAM and box
Feb. 27: edited slot on base again, came up with idea for second CAM to shake in two directions
Feb. 28: fooled into thinking I accidentally missed workshop day, assembled chassis for CAD workshop
March 1: worked on second CAM
March 4: Snow day!
March 5: took break and helped Ethan machine for Alfred
March 6: made CAD for bottom base, helped Ethan again and cleaned up closets
March 7: edited bottom base, made CAM for bottom base
March 8: Helped Izzy and Eli with SING human
March 11: finished chassis for CAD workshop day
March 12: edited bottom base dimensions, added some connectors for CAM
March 13: made other half of bottom CAM
March 14: Robotics Trip!
March 15: Robotics Trip!
March 18: edited dimensions for bottom CAM and base
March 19: added washers and connectors for second half of CAM
March 20: created counterbore connectors for both CAMs
March 20: created counterbore connectors for both CAMs
March 21: added place to connect bottom CAM to top base
March 22: tested prototype again to see what else to do, realized sorter needed to be a box
March 25: added walls for box, ruined all mates in full assembly
March 26: tried to fix mates on assembly, gave up and made new assembly
March 27: reassembled top part of sorter, realized there was a problem with the bottom sorter
March 28: almost finished reassembling new bottom CAM
March 29: made new bottom CAM and connectors, edited bottom base dimensions
March 30: finished CAD
March 30: touched up maker-site and added more to CAD