This Metal Production Estimator App allows the user to take a Resource or Reserve estimate and conceptualize a potential production scenario. This would use a user defined mine life to determine the processing rate and annual metal production. The App also estimates the insitu rock value and total contained metal in the Mineral Reserve.
Example
Say you have a gold deposit with a Resource of 50 Mt with Au grade of 1.5 g/t and Ag grade of 20 g/t. What might this deposit produce? Here's how to check this.
Lets assume we can convert 80% of the Resource into mineable Reserve. By mining the better grade ore we can increase the head grade up by 20%. So the Reserve would now be 40 Mt at 1.8 g/t and 24 g/t respectively. This would equate to an insitu rock value of about $326/tonne and 2.3 million ounces of gold insitu.
We might expect a heap leach recovery of 75% on gold and 60% on silver.
If we target a 10 year mine life, we need an ore processing rate of 4 Mt/year (or about 11,000 tpd). That's a fairly big operation. This processing rate equates to metal production of 173,000 oz gold per year and 1.85 Moz of silver. This size deposit may have interest for a mid-tier producer.
INPUTS
Input the Mineral Resource tonnage.
Reserve-to-Resource Factor: is an estimate of the percentage change in Resource that convert to Reserves.
Grade Factor: The Mineral Reserve can have a higher or lower grade than the Resource.
Reserve tonnage and grades: this incorporates the two factors described above,
Select Metals of Interest from the toggles.
User can modify metal prices.
User can modify process recoveries.
Mine Life: input a proposed mien life in years
OUTPUTS
The Insitu Rock Value is based on the metal prices and grades without any recovery or payable factors.
Annual and daily processing rates are based on the estimated mine life.
Annual metal production is based on the Insitu Metal x % Recovery / Mine Life.
Once you have created your scenario, you can save it in your "Downloads" folder and you can upload previous scenario files.