BCMCH Lab uses the Followinr Risk scale and Categorization
1. Risk = Probability x Severity, Risk ranges from 1-25, where 1-5 is LOW RISK, usaually Action not required, 6-10 is Medium Risk, Is an oppertuniity when High risk is not available can use for system improvement 11-25 is HIGH RISK Requires Madatiory Risk Mitication (Reduce, Transfer, Avoid ir accept) or Corrective actions. Probabaility P is measured in 1 to 5 scale: 1: Happens once in 1 year or less, 2: Happens once in 6 Months or less, 3: Happens once in a mont or less, 4: Happens once in every week or less, 5: Happens once in every day or more. Severity S is measured in 1 to 5 scale: 1: for Near miss events, 2: for no harm events, 3: for Small harm events, 4: for adverse events, 5: for Sentinel events
RCA (Root Cause Analysis ) is based on 5whys or preferably the Fishbone of 6M: Man, Machine, Material, Method, Measurement, Mother Nature (evironment)
MItigation when listed used the Most high risk ones, 3 or 5 of them for action, after listing / clubbing of others
Risk Analysis Flow Cytometry Lab Yearly PPT
FMEA Flow Cytometry Lab | Edit
Risk Analysis ACL Lab Yearly PPT
FMEA ACL Lab | Edit
Training materials
ISO