Competing in the Steel Bridge Competition requires teamwork and many hours of hard work in three distinct areas: (1) Design, (2) Fabrication, and (3) Build. We have a dedicated team of students for each of these areas.
Steel Bridge Team Captain: Mawaki Remi Bidjada
The Steel Bridge Design Team is responsible for imagining the form of the bridge and calculating the function of the bridge such that it can withstand the lateral and vertical load tests.
Design Team Captain: Ji Shin
The members of our Steel Bridge Design Team are:
The Steel Bridge Fabrication Team is responsible for executing the vision of the design team by transforming drawings and models into a physical bridge. To add to the difficulty, the bridge must be fragmented into pieces that are no larger than 36" x 6" x 6" and each piece must be bolted to another piece of the bridge.
Fabrication Team Captain: Tobias Goulet
The members of our Steel Bridge Fabrication Team are:
The Steel Bridge Build Team is responsible for participating in the timed build at the competition for which they must devote many hours of practice.
Build Team Captain: Mawaki Remi Bidjada
The members of our Steel Bridge Build Team are: