Structure Design
In order for the group to properly detail and imagine a bridge, Issy created a prototype truss bridge and tested with pennies.
Cost: $298,827.42
The bridge created by Raphael withstood the trucks weight and passed all the requirements.
This is the 3D bridge created by Ryan. The final weight tested was 220 lbs.