Road Bridges גשרי כביש בין עירוני
Road Bridges גשרי כביש בין עירוני
3 concrete cast-in-situ bridges, one precast pre-stressed concrete girders bridge, and an Underpass.
8 girder bridges built as stage A of this project, 5 more are in design stages.
A 3 -span bridge crossing the Jordan river, at 48° skew angle, main span 35 m, side spans 25 m, continuous structural scheme.
The deck is composed of longitudinal U shape (trapezoidal section) pre-fabricated pre-stressed concrete girders, and cast in place deck plate (using pre-fabricated reinforced concrete planks for soffit moulds, to avoid scaffolding).
The bridge is located at high seismic zone (category C - A.A.S.H.T.O) and is the first bridge in Israel using lead-core neoprene bearings as seismic base isolators for bearings.
Total cost app. 1,500,000 $.