Here are the parameters for budgeting which is the minimum that the designer can expect for SRP.s and the Second Year Acting Project. They can always ask for more than what is listed which may be approved depending on the production needs.
Up to 160 instruments (10% contingency is standard).
Up to 12 - CXI Scrollers or SeaChangers if available.
Up to 5 sheets of new color, all other color is pulled from stock.
Up to 5 added electrics and 6 booms, placement to be determined by the LD.
Cyc lighting, templates, practicals and all other needs will be based on the resources generally available to the production.