Search this site
Skip to main content
Skip to navigation
Fred Behning's e-Bugeye
e-Bugeye Project Overview
1) About the Sprite
2) Preparation
3) Batteries
4) Motor and Transmission Adapter
5) Controller and Electronics
Build Progress
01) 08/22/2012 Goodbye Old Friend!
02) 05/26/2012 eBugeye is For Sale!
03) 04/23/2012 Suspension and Handling
04) 10/07/2011 Reflections on EVCCON
05) 09/20/2011 Off to the Show
06) 09/11/2011 Finishing Up
07) 08/27/2011 First Test Drive
08) 08/26/2011 Dashboard and 12 Volt Controls
09) 08/18/2011 High Voltage Wiring Complete
10) 08/10/2011 The Long Pull and a Few False Starts
11) 07/19/2011 Building a Better Birdhouse
12) 07/17/2011 Leaf Arrives and Batteries in the Boot
13) 06/24/2011 Fifteen Minutes of Fame
14) 06/12/2011 Charging Inlet Port
15) 04/20/2011 Rear Battery Box
16) 04/09/2011 Under-Hood Wiring
17) 02/23/2011 Making it all fit
18) 02/20/2011 Under-hood 12 volt wiring
19) 02/12/2011 Front Controller and Battery Platform
20) 01/20/2011 Wheels Turn for the First Time
21) 01/16/2011 Driveshaft and Motor Mount
22) 11/13/2010 Install Motor/Transmission
23) 11/12/2010 Assemble Control Unit
Files
Fred Behning's e-Bugeye
Build Progress
Here we will document the steps in installing the components, listed by date.
Google Sites
Report abuse
Page details
Page updated
Google Sites
Report abuse