We are splitting the build-up into stages to help with organisations and costs.
Stage 2 of the build will be building the pump track , This will include, gravel and delivery, top soil/grass seed, and asphalt/delivery.
Process
For the second stage we will be building the actual pump track
Step 1:
Deliver the gravel and shape it into the design of the pump track
Step 2:
Test ride the gravel to make sure that the pump track is perfectly shipped for riding on
Step 3:
Deliver the asphalt and molded it over top of the gravel, once the asphalt is set the pump track will be painted.
Step 4:
Top Soil will be delivered to the pump track and layed down in between the pump track
Price
The prices will differ depending on whether different community partners help out to reduce the cost.
Gravel and Delivery - $184,000.00
Asphalt and Delivery - $104,852.00