Since January 2026, the team has been developing a final design program and robust schematic design of sufficient detail to establish the scope, budget and schedule for the proposed project.
Project Scope and Budget Agreement — Aug 2026
Reconciled Schematic Design Report with comments (PDF) — Aug 2026
Space Comparison: Existing / Proposed / MSBA Guidelines — Aug 2026
Construction Stages & Logistics — Aug 2026
Project Master Schedule and Permitting Timeline (2025-2034) — Aug 2026
Schematic Design Report contents (or download PDF) — June 2026
Exterior, Interior & Site Layout Plans
Total Project Cost Estimate
MSBA Comments, Reviews & Approvals
Environmental, Traffic & Site Studies
Preliminary Train Noise & Ground Vibration Study - March 2026 (New)
Pollard Middle School Logistics Plan — May 2026
Geothermal-Specific Documents
From May to December 2025, feasibility, location, and grade configuration were studied. Seven design options were narrowed to one preferred option.
Needham submitted its Statement of Interest for Pollard Middle School to the MSBA's Core Program in April 2023, and the MSBA invited the District into the Eligibility Period in December 2023.
The School Master Plan was first developed and presented in 2020, and was updated in both 2022 and 2023. This study provides the foundation for the Pollard Middle School Project.
In the fall of 2006, the School Committee discussed options for the use of High Rock as an interim solution to space issues at Pollard.
Discussion of options for High Rock School for middle school students (9/20/06)
Public Hearing for High Rock as satellite middle school space (10/3/06)
Recommendation for use of High Rock as interim middle school space (10/7/06)