OPEN HOUSE TOURS and Q&A October 4th @ 9:00AM In Person at Pollard Middle School
Welcome to the Past Meetings and Materials archive for the Pollard Middle School Building Project. This page provides a comprehensive record of our meetings, presentations, and supporting documents.
The School Master Plan was first developed and presented in 2020, and was updated in both 2022 and 2023. This study provides the foundation for the Pollard Middle School Project.
In the fall of 2006, the School Committee discussed options for the use of High Rock as an interim solution to space issues at Pollard.
Discussion of options for High Rock School for middle school students (9/20/06)
Public Hearing for High Rock as satellite middle school space (10/3/06)
Recommendation for use of High Rock as interim middle school space (10/7/06)
Town of Needham Boards met collectively to discuss the viability of continuing to study the two sites that are currently under consideration for the project: the DeFazio site and the current Pollard site, and whether or not both sites should continue into the next phase of the feasibility study.
SEPTEMBER 16, 2025Information presented on the options analysis and information about reuniting 6th grade with 7th & 8th.
SEPTEMBER 15, 2025A presentation of key decisions and timeline of the Preferred Schematic Report (PSR) was given.
SEPTEMBER 10, 2025Information session was held in the evening at Pollard and via Zoom to provide information on the project, review what we have been hearing, and to answer questions.
SEPTEMBER 2, 2025The submission of the Pollard Educational Program to the MSBA was discussed and approved. A resolution recommending the approval of the submission of the Preliminary Design Program (PDP) by the School Building Committee/PPBC was also approved.
SEPTEMBER 2, 2025The MSBA Preliminary Design Program (PDP) submission was shared and approved.
AUGUST 25, 2025The probable cost analysis was presented on preliminary options.
AUGUST 21, 2025A project overview and update was presented followed by a Q&A session.
AUGUST 20, 2025The Educational Program Requirements and a feasibility update.
The impact of the construction project on the athletic facilities at DeFazio.
AUGUST 4, 2025A presentation of seven preliminary options, including an matrix for comparing options.
JULY 21, 2025A presentation of the program diagram for Pollard, plus an overview of the project schedule through September 2025.
JULY 9, 2025Information sessions were held in the morning and evening at Pollard and via Zoom to provide information on the project and answer questions. Tours of Pollard followed the session.
Video Recording — Morning Session
Video Recording — Evening Session
Two sessions were held with educators and town leaders to discuss the reunification of grades 6-8.
MAY 20, 2025An update on the Pollard Middle School Project and overview of the MSBA process and schedule.