During This bridge project we divided the work up evenly between each of the group members. Avery worked on the abutments, Kyle worked on the deck, and I worked on the supports. The biggest change we had from our original design was in our deck. Our original deck was very weak so we decided to cut it into pieces. We used these pieces to create an I-beam which was much stronger. In the end our bridge held ____lbs. and we were very happy/disappointed. I used the collaboration transferable skill.