More detailed work on the fuel and spark circuits was performed, but the designs are not finalized. Work on TR-19 has resumed and the car is nearly ready to run.
Review of TR-19 condition
Began work on restoring TR-19
Researched fuel cut system and specified components
Finalize fuel and spark designs and choose a system (All Members)
Purchase components (Charlie)
Engine test start (Charlie and Jack)
Prepare car to drive (Charlie and Jack)
Risk reduction assembly of electrical system (All Members)
The sponsor is pleased with the current progress of the fuel cut circuit and is also relieved to know that TR-19 is in a close to running state.
Reach out to Steve Roberts to check over the circuit designs. This will be done once the circuit designs are near final stages. (April 1st, zoom meeting).
Be sure to document the design decision process between the fuel and spark circuits. This will be done over the weekend between Week 1 and 2. (April 1st, zoom meeting).
None
Finalizing circuits, ordering parts, and performing risk reduction as soon as possible will be critical to maintaining the intense schedule of this project.
None
The next milestone is to finish the design of the fuel and spark circuits, order components, and construct/test risk-reduction circuits.
Amount Spent: $0
Amount Remaining: $1600
Internal pages filled out, weekly updates from winter quarter were also updated as the site was not up at the time of those meetings.