Overview of the Status of Analysis, Design, Fabrication, Tests, etc.
Finished a minimal viable prototype
Further iterations on the current design to improve the functioning prototype
Adjusting Arduino control code accordingly
Accomplishments from Previous Week
Able to make a smear
Improved linear motion of the pressing rack
Improved the control code of the pushing system
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Ensure the smooth pressing and horizontal presser (Guanhao Fu)
Edit the Arduino control code for pressing and slide moving (Yi Cui)
Design and build a straw cutter for straight cutting edge (Lumei Xue)
Research for appropriate high friction material to keep the slide in position (Ruiqi Wang)
Design and build better distance adjusting mechanism of the straw stopper (Yuhui Shen)
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Will meet the sponsor on Friday (Feb 22, 10:00am)
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
The solenoid might not be the best option because we need to control the current
We cannot control displacement and force at the same time.
Spring could be used to control force
Controllable force for the first stroke.
Use a parallel flexure to prevent tilting or use linear bearings for constraining
Use computer interface (ex. Labview, matlab) rather than a potentiometer. Compile the script to prevent accidental alterations.
Investigate the cause of vibration and noise at high speed
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
None
Risks and Areas of Concern
Slide fell off during smearing due to insufficient friction between the slide and the holder (plan to replace the magnetic tape with rubber sheet for experiment)
The presser tilts
Fix the position of the pressing motor and the straw slope
Resources or Information Required but not Available
None
Schedule
Budget (list amount spent and amount remaining)
Amount spent: 240.11
Amount remaining: 2359.89
Progress on Report and Webpage
Have made three appointments in the writing hub and will improve the draft