Overview of Status of Analysis, Design, Fabrication, Tests, etc.
We have machined our new home cage that has a bottom
We have machined a new PVC pipe
There are new concerns about the gap between the PVC and the adaptor
The Water Delivery System is working
We now need to run tests to set the motor to run a certain amount of steps with the push of a button
Accomplishments from Previous Week
We have machined the new home cage and the new PVC tube
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Have the water delivery system delivery only 15mL with the push of a button
Find a good solution for our adaptor/PVC assembly
Hopefully have the electronics for the behavioral chamber from prototyping lab
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
N/A - our weekly meeting was moved from Monday to Wednesday
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Comments about our report (5/6)
Try to remove non-engineering language
smaller and less invasive tables
Add more illustrations
Add an abstract
Overall well-written and cohesive
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
Think about how lab techs will be able to switch the tube in and out while the rat is in the cage (4/30)
We will clarify with the sponsors how they are imagining on doing this
Risks and Areas of Concern
There is a gap in between the PVC tube and the adaptor
We need to clarify how much of a gap is ok
The PVC might be too easy to slide out and the rats can maybe escape
The lid gets in the way of the tube being able to slide in and out
We need to clarify what the process will be when the lab techs need to detach the chambers
Resources or Information Required but not Available
N/A
Budget (list amount spent and amount remaining)
Amount Spent: $348.44
Amount Remaining: $2651.56
Schedule
Describe upcoming milestone
Update Gantt chart.
Progress on Report and Webpage
Our first draft of the report has been uploaded
Most of the sections have information
Need to insert a lot of pictures
Webpage: Final Design Tab has been updated
Schedule
Describe upcoming milestone:
Getting parts from the prototyping lab
Callibrating the water delivery system
Clarifying with sponsors what they want from the PVC tube
Gantt chart