Overview of Status of Analysis, Design, Fabrication, Tests, etc.
1st prototype of behavioral chamber and home chamber have been built
Behavioral chamber : the top and bottom pieces have to be modified to fit better
Home chamber : the home cage with a bottom can now be cut
The adaptor pieces have to be modified a bit, but overall works the way we intended
The pump for the water delivery system works with the push of a button
Must be calibrated to release 15 mL
Accomplishments from Previous Week
Laser cut all parts needed for behavioral cage
Machined parts
Rectangle in our home cage
PVC tube with slots on either side
Assembled parts for water delivery system
Goals for Next Week. Use specific and measurable objectives.
Calibrate our water delivery system to be able to measure out 15 mL
Get electronics from inside the behavioral chamber from Prototyping lab
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
The 4 in. diameter PVC was a good size (4/29)
Make sure the gaps are small enough so the rats will not be able to escape (4/29)
Continue on without the pieces from prototyping lab and they will be added on when they are ready (4/29)
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Ask sponsors if 4 in. is maybe too big? Go back to 3 in or 3 1/2 in diameter PVC pipe (4/23)
Make an instructions guide for how to assemble adaptor piece (4/23)
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
N/A
Risks and Areas of Concern
Gaps in between PVC and adaptor are big enough for a rat to fit in and escape
The next iteration will be adjusted to account for this
Water delivery system needs to precisely deliver 15 mL a day
Resources or Information Required but not Available
N/A
Budget
Amount Spent: $202.44
Amount Remaining: $2797.56
Progress on Report and Webpage
Engineering Standards has been updated on the report
Schedule
Upcoming milestone:
Proof of Concept Presentation
Get behavioral chamber parts from Prototyping lab
Build a 2nd iteration of our chambers
Incorporate working water delivery system into our home chamber.
Gantt chart: