Overview of Status of Analysis, Design, Fabrication, Tests, etc.
We have a CAD model with the modifications made for the sponsor
Beginning to laser cut and 3D print parts
Waiting on Behavioral chamber parts from the prototyping lab
Beginning fabrication needed on PVC pipe and home cage
Accomplishments from Previous Week
Ordered all parts that will not be given to us by prototyping lab
Modified CAD
To fit the requests of sponsors
To allow for easier assembly on adaptor piece
Have a solid plan for the water delivery system
Talked to Steve to make sure this was the best way to accomplish our goals
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Build first prototype of home chamber, behavioral chamber, and bridge with adaptors
Get in touch with prototyping lab to get the parts that belong in the behavioral chamber
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Think about possibly adjusting our designs to be able to connect multiple behavioral chambers together (4/22 in person)
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
We have lots of plans, but would like to see something actually built (4/16 in person)\
Planning to build this week
Quantify the requirements that's we have (4/16 in person)
Adjust our website / presentations to include more numbers
Our graphics are effective (4/16 in person)
Look into piston pumps for our water delivery system (4/16 in person)
Think about making the adaptor out of sheet metal (4/16 in person)
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
N/A
Risks and Areas of Concern
Not sure if the water delivery system will work the way we want it to or with the amount of precision that we want
The adaptor made out of acrylic might be too heavy
Resources or Information Required but not Available
N/A
Budget (list amount spent and amount remaining)
Spent: $117
Amount Remaining: $2883
Progress on Report and Webpage
Webpage: Filled out main parts
Need to show a preliminary design
Report
Filled out Chapter 1
Added impact on society section
Schedule
Upcoming milestone
Build Prototype by 4/29
Gantt chart: