Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Testing showed that the final design worked better than expected, effectively discharging the sample without interfering backscatter electron beams
More flow splitters for the other SEM and for spare were made
Accomplishments from Previous Week
Machined and assembled more flow splitters for sponsors
Presented the final design review to sponsors
Finished the final report, poster, and website of this project
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Getting ready for the poster session (everyone)
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
N/A, Tristan is in Europe until 6/11
The presentation was well done! (by Steve and Tom in person on 6/6).
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Change the font and pictures in poster, and make the sentences more concise(6/6 in person)
Action: Finished the editing
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
Report and website are edited as commented (from team 2 via email)
Risks and Areas of Concern
CNC Machine has a very busy schedule
Tom is very busy
Pieces are fragile and may break when being manufactured
Resources or Information Required but not Available
N/A
Schedule
June, 14th -- Poster session and final check off
Budget (list amount spent and amount remaining)
$259.99 for PEEK reinforced with 30% carbon fibers
$390.00 for Machining at CRMS
$42.70 for Grade 2 Titanium, 1 inch wide, 1 ft long, 1/4 in thick
$65.92 for Uncoated Carbide Square-End End Mill, 2 Flute, 1/64’’ Mill Diameter
$21.68 for 1 foot of 316 Stainless Steel Tubing with 0.025" OD
$4219.71 remaining
Progress on Report and Webpage
Final Poster and Report and Webpage is finalized