Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Individual Component Analysis and CAD Design in progress
Accomplishments from Previous Week
Kick-off meeting with Sponsor
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Risk reduction presentation (All)
Individual Component Analysis topic selection(All)
Brake Design Challenge (All)
Fatigue Homework (All)
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments
Prepare nozzle designs as soon as possible
Get CAD Design out as soon as possible
Instructor Comments from Last Meeting and Actions Taken to Address these Comments
Getting touch with potential materials for nozzle
Know the structure and design of whole assembly
Risks and Areas of Concern
Testing of prototype
Vacuum safe material with long life cycle
Stainless steel and Titanium are hard to be machined
Resources or Information Required but not Available
Manufacturing cost estimates
Information on nitrogen supplying system
Schedule
Meetings with Sponsor Tuesdays at 2pm
Group meeting after Sponsor meeting
Budget (list amount spent and amount remaining)
$0 spent
$5000 remaining
Progress on Report and Webpage
Don't have access yet