Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Design
Refined a Semi-Final Design in Pro/E - Ready to 3D Print
After Fabrication of the Prototype a more Complete Final Design will be Produced
Fabrication
We have Procured Necessary Hardware for Fabrication
Fabrication of the Prototype will begin after 3D Printing all the Components of the Sensor (Hopefully 2/29)
Analysis/Tests will begin after Fabrication
Preliminary Tests will be done by coupling the Sensor to a DC Motor
Further Refined Tests will be done in the Wind Tunnel
Accomplishments from Previous Week
Completed and Refined the Design of the Prototype in Pro/E
Procured Necessary Hardware Parts for Fabrication
Further Tested Magnet/Coil Placement
Updated Bill of Materials
Updated Schedule
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Complete and Compile 2nd Draft of Report - All
Complete 2nd Draft of Webpage
Layout - Isaac, Eric A.,
CAD Management - Anthony
Budget - Eric K.
Fabricate Prototype - All
Completer ProtoBoard Layout and Preliminary Program for Testing - Isaac
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments
Refine CAD Files for 3D Printing
Action = CAD Files were Completed and Submitted for 3D Printing
Use of Bosses For Screws
Action = Bosses were Added to the Design
Further Test the Magnet and Spool
Action = The Magnet and Spool were Tested
Instructor Comments from Last Meeting and Actions Taken to Address these Comment
Concerns about Potentiometer Tolerance
Action = Appropriate Potentiometers were Researched
Concerns about Press Fitting Bearing
Action = Considering Possibility of using Hot Glue - More Actions to be Taken upon Fabrication
Concerns about Clearance Hole at Top of Housing for Shaft - Possibly using Bronze/Plastic Sleeve Bearing
Action = Plastic Bearings were Ordered and a Plan of possibly Using it during Fabrication was Discussed
Risks and Areas of Concern
Fabrication Risks are Expected and Planned For
Resources or Information Required but not Available
N/A
Schedule
Upcoming Milestones
Complete 2nd Draft of Report/Website
Fabricate Prototype
Complete Software for Prototype
Budget (list amount spent and amount remaining)
Amount Spent = $233.53
Amount Remaining = $2266.47
Progress on Report and Webpage
Report: Began Work, Revisions, and Separating Sections for 2nd Draft
Webpage:Â Continually Used/Maintained