Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Presentation was completed
Aiming to get a quote on machine shop work during week 4
Pallet truck was received and dimensions were studied
List of risks was put together
Accomplishments from Previous Week
CAD of cabinet and pallet truck was animated
Further stress analysis was done.
Additional tile for testing was purchased
Ravi got a sign off from Isaiah on our safety guidelines to be posted in the work area
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Get quote on machine work: Evin
Begin machining the pallet truck - Machine shop professionals
Velocity analysis (max velocity before tipping) - Nathan
Buy straps: Michael
Backplate
Stress analysis on bolts
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Comments were from a conference call done on 4-16. They asked us to buy simple straps for now and specialized straps later on, as well as to buy the programming control. Teradata also wants the straps to have some clearance for the varying door widths and for us to ensure there is no shifting of the cabinet during movement
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Delson asked for a CAD animation and more stress analysis, as well a full list of possible risks
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
They were concerned after the turning of the mover, brakes for the cabinet wheels, and fatigue of the platform
Risks and Areas of Concern
Structural:
ØEnsure the platform and legs are strong enough
ØEnsure the linkage and bearings inside linkage function properly under full loading: analysis
Operation:
ØEnsure tipping is not a possibility by reducing acceleration / top speed of the unit : analysis
ØEnsure all clearance dimensions are met
ØEnsure cabinet is strapped in and secured: testing
ØEnsure cabinet is not scratched / damaged by unit: design
Resources or Information Required but not Available
Schedule
upcoming milestone: Begin fabrication of the pallet truck design
Budget (list amount spent and amount remaining)
4200+143+21 spent on truck, wheels, spare tiles.
Progress on Report and Webpage
Risk reduction section and design solutions considered have been updated