Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Laser positioning (manufacturing process improvement) has been eliminated. Process improvement team is assuming that responsiblity. Design will be proposed to them
Current designs are considered "alternatives" to bosses
Fabrication of alternate bosses will begin Wednesday 4/25
Accomplishments from Previous Week
Briefed Solar on current status of project
Presented concepts/presentation to Solar
Gathered more information on the fluid issue
Bosses have been sent from Texas; need to be picked up at Solar
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Prototype at least 1 boss concept (Cary/Luis)
Have atleast 3 more xy concepts (Team)
Determine thread size needed for bosses (Cary)
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Meeting on Friday 4/20 in person
Discontinue efforts to improve manufacturing and engineering process
Present more x,y, and/or z concepts
Fluid concerns encompass all fluids; condensation, drainage fluid
Content with current progress (CAD models)
Build a small scale drip pan to place prototypes in
Models of designs will be given to Solar
Send availability to schedule a meeting 4th week..preferably Friday
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Meeting on 4/12 in person
Capping mechanism in a convex shape to prevent the trapping of fluids
Attaching a type of sleeve to mounting system to prevent liquid pooling
Quantify fluid pooling
Transparent and semi-transparent drawings. Include bolts in drawing
Flexible shaft cuff-lings
Cost limit?
Presentation on 4/17
How much load per boss? We are expecting 11,000 lbs on 6-8 bosses
More x-y designs
Scissor Jack mount looks incompatible because of required clearance from drip pan to module
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
Feedback has been uploaded onto team page. While feedback was good, most addressed the positioning issue and recommended using laser distance measurement which we proposed 4/17 via person
Concerns about boss designs being able to handle weight of components 4/17 via person
Concerns about thread strength to handle load 4/17 via person
Risks and Areas of Concern
Loads on bosses
Thread strength
Size constraint
Resources or Information Required but not Available
Book on threads (Have pictures of pages) [Uploaded to references]
Schedule
Describe upcoming milestone
Update Gantt chart.
Budget (list amount spent and amount remaining)
Amount spent to date $3327.21
Amount remaining for prototyping $750
Progress on Report and Webpage
Ch. 1 is mostly done
Impact on society done
Webpage is up to date with presentations/documents
New CAD files need to be uploaded to page