IIPS Website is reinitiated
Team of Misha, Komal, Bedi, Akanksha,Shefali, Shlok is given responsibility for Maintenance and Support of existing Website.They have been asked to implement CR-Change Request in contents.With the support of Ankit Kulkarni they have done extreamly well job of
Creating web page of Down
New Team for unsuccessful projects-Is to identify
Resources for support system are to be required, demanded.
February-2013
Guest Lecture by Dharmendra Rajput form MANIT on Data Mining and Data Analysis tools SAS (2 Feb,2013)
January-2013
IBM-TGMC (Final SRS).
PBAS(API Score calculation).
Leave management System(under development).
Feedback data entry and report generations.
Update IIPS website.
Inner Navigation bar problem corrected .
Replaced "news icon" with "dc icon" as news was left with rss feed,which was never updated.
Alumni page updated.
IIPS Wikipedia page linked
Reach us page updated!
About IIPS:- Achievements link hided (database server error).
Alumni:-jobs link (blank) hided.
Xpression:-Xpression score link hided(database server error).
Documentation of IIPS Accounting System.
Installation of CDS Invenio.
December 2012
Alumni information up dation on www.iips.edu.in
Maintenance of DC computers and Server installation talk.
Planning of weekly workshop by DC members on Software Project Management-To be given byShlok and Sunny (PPTs are to be uploaded )Topics are as under:
Introduction to SAD
Six Best Practices
Develop iteratively, with risk as the primary iteration driver[2]
Manage requirements
Employ a component-based architecture
Model software visually
Continuously verify quality
Control change
Software Development Models
Prototyping
Waterfall model
Spiral model
Iterative and incremental development
Agile development
Rapid application development
Code and fix
Software Project Management -For IIPS-DC
November 2012
Learning of aspects of User Management System for atomization of college
Preparation and uploading of Alumni meet form and preparing backups
Feedback Collection after the examination
October 2012
Faculty Feedback system of IIPS (Data Pre processing,Data Entry,Graph preparation)
Resource person feedback during training at Academic Staff College (ASC)-Devi Ahilya University,Indore.
Brochure for Symposium designed by DC-Ajeet and team
Engineers day celebrated by DC- Bhaskar Jain,Nitesh Mishra, Shefali and team
September 2012
Creating and building System to work from garbage and nonworking computers. Took arround 1.5 month
Amber jain, Ankit , Ajeet, Nitesh,Sachin had worked hard and stayed more then 17 hrs at DC to current running status.
The hard work of above would be remember always till the existence of iips dc
July 2012 (7-7-2012)
Task-1-Library (Project Fedena, CERN Physics lab,Galaxy)
Task-2-Career Counselings
Task-3-LMS(Moodle)
Instruction to be given(Document everything)
Ethics and Moral responsibility
Way of communication in D.C. (Professional Approach-Presentation iwant2doproject....)
Advocacy of Open source (Data base MYSQL)
Doxygen, Zotero
10-7-2012
Working and Processing ,reply on group
Preparation of registration
14-02-2012
Spiral Model, Completion of Literature survey ,Spiral Model,
Preparation of SRS
Completion of R project form
Completion of Grid/Cloud Computing form
16-7-2012
Presentation of Literature survey
Literature review-revisit CERN documentation
20-7-2012
Scheduling of presentation
Professional Up gradation (Android classes by S/W Engineer Vaibhav Singh -2 Hrs daily)-To be Commence from Sunday 23-07-2012
Calendar /Planning -Planning for future projects
25-07-2012
Linux tutorial for get ready for Future projects
Preparation of a machine with Linux
Setup of SERVER
Cloud Set UP at development server(Open Stack , Eucalyptus )
Time management to mange Classes (MCA /M Tech),
DC - Up-gradation /Awareness Classes,Literature survey of Open source documentation for Task-1 ,2,3
(As decided on 7-7-2012)
Try to get Open /Free Server space for trial of web applications