156B Week 3
Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Overall design is finalized.
Most components of prototype is finished. All purchases have delivered.
Accomplishments from Previous Week
Most of prototype components are finished.
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Finish prototype. (whole team)
Test functionality of drive train. (whole team)
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
No sponsor meeting since sponsor is out of town.
The goal is to finish prototype by the end of April, at when sponsor would come back.
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
3-D printing can only use for prototype. (In class)
We changed our selection of material, from 3D printing PLA to PVC, since we want to finalize the prototype as much as possible. Redo all manufacture after prototyping would wastes a large amount of time.
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
N/A
Risks and Areas of Concern
Space in the bottom plate is limited. Motor and gantry need to be settled on the bottom plate without any conflict.
The connecting between transducer gate and tube is too tight.
Resources or Information Required but not Available
N/A
Schedule
Budget (list amount spent and amount remaining)
Progress on Report and Webpage
Website updated on April 16, 2019