Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Planning and buying remaining parts
Redesign water reservoir
Design various mounts
Documentation on all parts
Research and design of engine coupler
Accomplishments from Previous Week
Contact Coxreels and Reelcraft about hand crank reels for electrical cable storage on dyno - Ben
Decided on throttle body control system design using a linear servo
Documented 12V system and fuel system
Frequency analysis done
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Reservoir Lid Design and Make
Finalize Water Brake Loop (Bicky)
Order all Parts for:
Electrical Box (Ben)
12V System (Daniel)
Fuel (Alec)
Throttle (Bicky)
Shifter and Clutch (Bicky)
Throttle system (Bicky)
Complement assembly by end of the week
Documentation
Solve Resonance Issue (Daniel)
Design Engine Coupler (Daniel)
Safety Schematic (Daniel)
Attach various mounts to frame
Electrical Box (Ben)
Water Pump (Alex)
Fuel System (Alec)
12V System
Engine Panel (Alec)
Control Station
Hall Sensor (Alex)
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Met with sponsor (Rob) and gave updates on the risk reduction (Water brake, testing water pump, load cell reading) (in-person, 4/10/18)
Rob's main concern was electronic controls (in-person, 4/10/18)
Rob mentioned of wire EDM shop in El Cajon (in-person, 4/10/18)
Contact Lord Coupling to possibly discuss/get help on coupler analysis and damping/resonance problems (in-person, 4/10/18)
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
More real pictures/ utilize the CAD and actual pics of dyno for future reports and presentations
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
None
Risks and Areas of Concern
Changing natural frequency of system
Noise in the data
Resources or Information Required but not Available
Schedule
Describe upcoming milestone
Update Gantt chart.
Budget (list amount spent and amount remaining)
$252.19 Spent this week
$716.66 Remaining
Progress on Report and Webpage
Uploaded Title Page, Project Background, Deliverables, Review of Existing Solutions, and Appendix with Individual Component Analysis to the website