Following fabrication of all standard parts, assembly follows:
Gluing the motor clamp
Spool overview
Applying silicon lubricant to Ikelite gland o-ring
Reassemble and reinstall Ikelite Gland
Insert washer and coupler
Inserting motor into clamp
Tightening the hose clamp
Installing the spool holder
Separating the motor assembly from the buoy assembly
Installing the anti-rotation coupler
Inserting a threaded insert into side of buoy
Press-fitting threaded insert into buoy
Grinding down hose-clamps
Gluing motor cap into o-ring pressure coupler
Gluing bottom cap into o-ring pressure coupler